Electrical Submersible Pumps (ESP)
المضخات الغاطسة الكهربائية (ESP)
- Next date
- Available in-house
- Fees from
- —per delegate
- Formats
- In-house training0 sessions
- Duration
- 5 daysCertificate
Overview
Electrical submersible pumps lift more oil than any other artificial lift method worldwide, and they are the first choice for high-rate wells and for many mature fields with rising water cut. They are also expensive to pull and replace, so every extra month of run life has a direct effect on field economics. This course covers ESP systems from selection and design through installation, operation and failure analysis. Participants learn the components of an ESP string, including the pump, intake, gas separator, protector, motor, cable and surface equipment, and how each one fails. They practise pump sizing for given well conditions, including the effects of gas, viscosity and sand. The course places strong emphasis on operating ESPs with variable speed drives, reading amp charts and downhole sensor data, and using dismantle inspection findings to improve run life through better design and operating practices.
Objectives
- Describe the components of an ESP system and their functions
- Select ESP as a lift method and recognise its limits
- Size pump, motor and cable for given well conditions
- Account for gas, viscosity and solids in ESP design
- Operate ESPs with variable speed drives and downhole sensors
- Interpret amp charts and diagnose operating problems
- Use dismantle inspection and failure analysis to extend run life
Who should attend
Production and petroleum engineers, artificial lift specialists, well surveillance engineers, field supervisors and electrical staff supporting ESP operations.
Training methodology
Participants size a complete ESP system by hand for a sample well, then check it with design software and examine how the design changes with water cut and gas. Real amp charts, sensor trends and VSD logs are interpreted in groups to diagnose gas locking, pump wear, underload and motor problems. Dismantle inspection photographs from failed pumps are used to identify failure causes. The course closes with a team review of a field's ESP run-life data and proposed improvements.
Programme outline
Day1ESP Fundamentals
- ESP applications and limits
- Comparison with other lift methods
- System components overview
- Centrifugal pump stages and performance curves
- Intake and gas separators
- Protectors and seal sections
- Practical exercise: reading pump curves
Day2Motors, Cables and Surface Equipment
- ESP motors and cooling
- Power cables and penetrators
- Switchboards and variable speed drives
- Transformers and junction boxes
- Downhole sensors
- Electrical testing
- Video session: ESP installation
Day3ESP Design
- Well and reservoir data for design
- Inflow performance and total dynamic head
- Pump sizing and stage count
- Motor and cable selection
- Gas handling and viscosity corrections
- Practical exercise: complete ESP design
- Design checks with software
Day4Operation and Surveillance
- Start-up and commissioning
- Operating with variable speed drives
- Amp chart interpretation
- Downhole gauge data
- Gas locking, underload and overload
- Practical exercise: diagnosing operating problems
- Real-time monitoring and alarms
Day5Run Life Improvement
- ESP failure modes
- Dismantle inspection and failure analysis
- Sand, scale and corrosion effects
- Run life metrics and benchmarking
- Team exercise: field run-life review
- Improvement plan
- Final assessment
Dates and fees
There are no scheduled dates for this course at the moment. Request it as in-house training, or ask us about the next date.
Certificate
Every delegate who attends the full programme receives a Harfard Technology certificate of completion stating the course title, duration, dates and venue.
Frequently asked questions
Will I receive a certificate?
What is the difference between classroom and online?
Can you run this course for our company?
How do I register?
Related courses
Exploration & ProductionPetroleum Geology for Non-Geologists
14–18 December 2026 · Singapore +4 dates
Exploration & ProductionOil & Gas Production Operations
4–8 January 2027 · Tokyo +4 dates
Exploration & Production